Hi there
I've added a text widget to my side bar and worked out how to create links with HTML (something i never though i could do!!), but i still can not figure out how to delete 'archives'. Addiding a widget to the side bar does not get rid of it. Does anyone know how to get rid of archives?
Also, my text widget is titled 'links'…. if i add a 2nd text widget (for example called 'articles'), it will automatically go under the existing 'links' section. Is there a way to add the 2nd text widget and have it go ABOVE the existing links section?
If i go to my sidebar section in widgets and edit my text, i can not highlight or copy anything. So if i have to manually re-create the 'links' section below the new 'aricles' section, it will be a hec of a lot of work to re-do all the HTML for the links.
thanks so much
Yuri